Balcony waterproofing before tiling in Medina
Free survey · written quote in 24 h · firm price in writing
Rainy season Nov–Mar · act before the first leakFree quote within 24 hours
Leave your details: we call you back and book the free survey, at no cost and with no obligation.
Our trade fits in one line: terraces and flat roofs. For balcony waterproofing before tiling in Medina we bring the experience of hundreds of roofs across Marrakech and the Haouz, branded materials and a price fixed before we start. Message us on WhatsApp or use the form: reply within 24 hours.
Rainy season Nov–Mar: The Marrakech rainy season runs from November to March: that is when every tired terrace reveals itself. An ignored leak costs up to 10 times the price of waterproofing — damaged beams, lifted tadelakt, mould, repainting — and cuts the value of the property. The right time to waterproof is before the first heavy rain, not after it.
Balcony waterproofing before tiling in Medina: the job
For balcony waterproofing before tiling in Medina, everything is simple: free survey, quote within 24 hours, one to two days of clean work. The right reflex: a water-tested flexible membrane, then new tiles on top. Tiles decorate, the membrane protects — not the other way round. Reference budget: 100–180 DH/m², with a written warranty.
The Medina context
The Marrakech Medina is our home ground: hundreds of riads with centuries-old flat roofs built from earth, cedarwood and lime, where traditional waterproofing — rammed earth layers and tadelakt — is reaching the end of its life. Every job here must respect ADER rules and the UNESCO listing: no hauling tonnes of rubble through narrow derbs, no altering the roofline of the terraces. We use light materials compatible with pisé: flexible resins, flame-free self-adhesive membranes, parapet upturns rebuilt to standard. Leaks in the Medina are unforgiving: they rot the wooden beams, swell the earthen walls and lift the tadelakt off bedroom walls.
For balcony waterproofing before tiling in Medina we bring the same care as on our central Marrakech sites: certified materials, proper application and a clean handover, every time.
How we work: four steps
Free on-site diagnosis
A specialist — not a salesman — comes in Medina to record measurements, moisture and critical points, and to understand what is really needed.
Firm offer, line by line
Within 24 hours, the written quote: the figure you read is the final one, valid and locked.
Fast, careful intervention
Agreed time slots, protection everywhere, certified materials: the house stays liveable during the works.
Handover and final check
Flood or hose test, before/after photos, ten-year warranty: everything is handed over in writing.
What it costs: 2026 prices
| Work | Indicative price 2026 | Notes |
|---|---|---|
| Balcony waterproofing before tiling | 100–180 DH/m² | turnkey, finish included |
| Balcony waterproofing without demolition | 120–220 DH/m² | same service, different work |
| Balcony leaking onto the neighbour below | from 900 DH | same service, different work |
| Loggia waterproofing | 100–200 DH/m² | same service, different work |
| Survey and written quote | free | no obligation, locked price |
Real 2026 price ranges: every roof is different, which is why we only put the final figure in writing after the free survey. And it never changes.
Frequently asked questions: Balcony waterproofing before tiling in Medina
Between 100 and 250 DH/m² depending on the system: liquid membrane 120–220 DH/m², waterproofing under tiling 100–180 DH/m², walkable finish extra. An 8 m² balcony is usually treated for 1,200–2,800 DH.
Call us quickly: every rain makes the damage worse and you are liable. We locate the water path (threshold, corner, drain), repair it and give you a written warranty — also useful with the neighbour and the building manager.
Yes, if the tiles are well bonded: ceramic bonding primer then reinforced liquid membrane. If areas sound hollow, we rebuild them locally — we never lay a membrane over a moving substrate.
One to two days for a standard balcony, plus drying between coats. The balcony is out of use for 24–48 hours, then back to normal with the right finish.
Trusted in Medina
“A leak in the middle of the rainy season: fast response, temporary weatherproofing then the final repair at the quoted price.”
Anna S. · Medina“I was looking for an alternative to full demolition: liquid membrane and the terrace was like new in three days. I wish I had called earlier.”
Leïla H. · Medina“Water came through the living-room ceiling every time it rained. Survey on Thursday, quote the next day, work finished in four days. Not a drop since.”
Isabelle C. · MedinaFree quote for balcony waterproofing before tiling in Medina
Message us on WhatsApp or fill in the form above: free survey, written offer within 24 hours and a firm price. You talk to flat-roof specialists, not a call centre.
+39 351 481 6739