Membrane over old roofing in Chichaoua
Free survey · written quote in 24 h · firm price in writing
Rainy season Nov–Mar · act before the first leakFree quote within 24 hours
Leave your details: we call you back and book the free survey, at no cost and with no obligation.
Chichaoua: we carry out membrane over old roofing with waterproofing systems proven under the Marrakech climate — extreme summer heat, concentrated rain from November to March. You pay only after reading the quote: free, written and without obligation.
Rainy season Nov–Mar: The Marrakech rainy season runs from November to March: that is when every tired terrace reveals itself. An ignored leak costs up to 10 times the price of waterproofing — damaged beams, lifted tadelakt, mould, repainting — and cuts the value of the property. The right time to waterproof is before the first heavy rain, not after it.
Membrane over old roofing in Chichaoua: the job
A well-laid bituminous membrane beats every patch in the world: membrane over old roofing in Chichaoua with clean welds, upturns at the right height and real sun protection. When the old membrane still adheres, the new one goes over it after preparation: no stripping, no rubble and part of the cost saved. The indicative spend is 200–300 DH/m²; the final figure is written before we start and never changes.
The Chichaoua context
Chichaoua — both the road and the province — is seeing fast housing growth: new houses along the Marrakech–Essaouira axis, small residences, farms converted into guesthouses. Flat roofs are the rule there, and waterproofing is often the local builders’ last priority: a quickly laid bitumen layer, no upturns, drains pouring water down the facades. We work along the whole Chichaoua road — from Tamensourt to the provincial capital — with the same methods as in Marrakech: diagnosis, written quote, warranted systems. For rural guesthouses, a watertight, usable terrace is also a direct selling point.
We work in Chichaoua every week: we know the local building types and we already know where to look for membrane over old roofing — door thresholds, parapets, roof drains.
What it costs: 2026 prices
| Work | Indicative price 2026 | Notes |
|---|---|---|
| Membrane over old roofing | 200–300 DH/m² | turnkey, finish included |
| Bituminous membrane for riads | 220–350 DH/m² | same service, different work |
| Bituminous parapet upturns | 100–170 DH/m | same service, different work |
| Membrane with gravel protection | 240–350 DH/m² | same service, different work |
| Survey and written quote | free | no obligation, locked price |
Real 2026 price ranges: every roof is different, which is why we only put the final figure in writing after the free survey. And it never changes.
Trusted in Chichaoua
“For membrane over old roofing they recommended the simplest solution, not the most expensive one. You can tell they are technicians, not salesmen.”
Mohammed A. · Chichaoua“Detailed quote, no extras at the end of the job and a written 10-year warranty. Everyone should work this way.”
Youssef B. · Chichaoua“Perfect communication on WhatsApp from start to finish: I always knew what would happen the next day and who would be in my house.”
Anna S. · ChichaouaHow we work: four steps
Free survey in Chichaoua
We come and measure on site, free of charge and without obligation: membrane condition, falls, drains, upturns and every weak point of your flat roof.
Written quote within 24 hours
You receive an offer itemised line by line: materials, labour, timelines. The price is firm and locked in writing.
Tidy, protected site
We protect stairwells, facades and plants; we work zone by zone and leave the site clean every evening.
Testing and written warranty
Water-tightness test before handover. You leave with a written warranty of up to 10 years and after-works follow-up.
Frequently asked questions: Membrane over old roofing in Chichaoua
Often not: if the old membrane still adheres, we lay the new layer over it after preparation. If it is blistered or detached, stripping is unavoidable — the free survey settles the question.
Not directly: it is protected with gravel, slab-on-pedestal decking or tiles. If you want to walk on the terrace with no covering, traffic resin is the right answer — we compare both in the quote.
Single layer 180–260 DH/m², double layer 260–350 DH/m², self-adhesive 200–320 DH/m², upturns 100–170 DH/m. For a 100 m² terrace, expect roughly 22,000–35,000 DH double-layered, confirmed by quote after the free survey.
Double layer, almost always: the second layer protects the first one’s welds and doubles the service life. Single layer only makes sense on non-traffic roofs on a tight budget — and we tell you so honestly at the survey.
Before the rainy season, make your terrace safe
From November to March, an ignored leak costs up to 10 times the price of waterproofing. WhatsApp or form: we can be in Chichaoua within days for a free diagnosis.
+39 351 481 6739