Epoxy pool coating in Medina
Free survey · written quote in 24 h · firm price in writing
Rainy season Nov–Mar · act before the first leakFree quote within 24 hours
Leave your details: we call you back and book the free survey, at no cost and with no obligation.
Looking for a specialist for epoxy pool coating in Medina? Flat roofs, terraces and waterproofing are all we do, in Marrakech and across the Haouz. Free survey, written quote within 24 hours and a firm price before the first roller stroke. Not a general builder: a flat-roof specialist.
Rainy season Nov–Mar: The Marrakech rainy season runs from November to March: that is when every tired terrace reveals itself. An ignored leak costs up to 10 times the price of waterproofing — damaged beams, lifted tadelakt, mould, repainting — and cuts the value of the property. The right time to waterproof is before the first heavy rain, not after it.
Epoxy pool coating in Medina: the job
Epoxy pool coating in Medina starts with the state of the shell: structure, cracks, fittings, old finish. Waterproofing and finish in one product: potable-grade epoxy, sand or blue tints, minimal maintenance. The indicative cost is 220–400 DH/m²; after the free survey, the price is fixed in writing and locked.
What it costs: 2026 prices
| Work | Indicative price 2026 | Notes |
|---|---|---|
| Epoxy pool coating | 220–400 DH/m² | turnkey, finish included |
| Basin and fountain waterproofing | 200–400 DH/m² | same service, different work |
| Hammam waterproofing | 300–550 DH/m² | same service, different work |
| Tank and cistern lining | 180–350 DH/m² | same service, different work |
| Survey and written quote | free | no obligation, locked price |
Indicative 2026 prices, labour and materials included. The final amount is locked in writing after the free survey.
The Medina context
The Marrakech Medina is our home ground: hundreds of riads with centuries-old flat roofs built from earth, cedarwood and lime, where traditional waterproofing — rammed earth layers and tadelakt — is reaching the end of its life. Every job here must respect ADER rules and the UNESCO listing: no hauling tonnes of rubble through narrow derbs, no altering the roofline of the terraces. We use light materials compatible with pisé: flexible resins, flame-free self-adhesive membranes, parapet upturns rebuilt to standard. Leaks in the Medina are unforgiving: they rot the wooden beams, swell the earthen walls and lift the tadelakt off bedroom walls.
For epoxy pool coating in Medina we bring the same care as on our central Marrakech sites: certified materials, proper application and a clean handover, every time.
How we work: four steps
Free on-site diagnosis
A specialist — not a salesman — comes in Medina to record measurements, moisture and critical points, and to understand what is really needed.
Firm offer, line by line
Within 24 hours, the written quote: the figure you read is the final one, valid and locked.
Fast, careful intervention
Agreed time slots, protection everywhere, certified materials: the house stays liveable during the works.
Handover and final check
Flood or hose test, before/after photos, ten-year warranty: everything is handed over in writing.
Trusted in Medina
“For epoxy pool coating I had three quotes: theirs wasn’t the cheapest but it was the only one itemised line by line. Price respected to the dirham.”
Mark T. · Medina“They re-waterproofed without demolishing: no rubble in the stairwell, a tidy site every evening. The neighbours noticed nothing.”
Leïla H. · Medina“Our riad terrace was redone respecting the Medina’s constraints: materials carried in by hand, parapets rebuilt, zellige preserved. True specialist work.”
Leïla H. · MedinaFrequently asked questions: Epoxy pool coating in Medina
Allow 7 to 14 days after application ends, depending on the system (full curing is mandatory). We give you the refilling date in writing in the works schedule.
We handle the waterproofing of the shell and the fittings (skimmers, lights, jets). If the leak is in the buried pipework, we locate it and coordinate the repair with your pool contractor.
From 200 to 500 DH/m² of shell surface (floor + walls) depending on the system: flexible mortar under a finish 250–450 DH/m², epoxy as finish 220–400 DH/m². An 8×4 m pool usually runs 25,000–60,000 DH.
In Marrakech, summer evaporation reaches 1–2 cm a day, no more. If you lose more, or if the level drops with the pump off, it is a leak: we locate it without fully draining the pool.
Before the rainy season, make your terrace safe
From November to March, an ignored leak costs up to 10 times the price of waterproofing. WhatsApp or form: we can be in Medina within days for a free diagnosis.
+39 351 481 6739