Spa and jacuzzi waterproofing in Medina
Free survey · written quote in 24 h · firm price in writing
Rainy season Nov–Mar · act before the first leakFree quote within 24 hours
Leave your details: we call you back and book the free survey, at no cost and with no obligation.
If you are comparing quotes for spa and jacuzzi waterproofing in Medina, here you will find real prices in dirhams, honest timelines and a team that only does flat roofs and terraces. The survey costs nothing and the quote is firm: no surprises at the end of the job.
Rainy season Nov–Mar: The Marrakech rainy season runs from November to March: that is when every tired terrace reveals itself. An ignored leak costs up to 10 times the price of waterproofing — damaged beams, lifted tadelakt, mould, repainting — and cuts the value of the property. The right time to waterproof is before the first heavy rain, not after it.
Spa and jacuzzi waterproofing in Medina: the job
Spa and jacuzzi waterproofing in Medina starts with the state of the shell: structure, cracks, fittings, old finish. Jets, jets and moulded seats: every penetration is a leak risk that we treat individually, with a pressure test. The indicative cost is 300–550 DH/m²; after the free survey, the price is fixed in writing and locked.
What it costs: 2026 prices
| Work | Indicative price 2026 | Notes |
|---|---|---|
| Spa and jacuzzi waterproofing | 300–550 DH/m² | turnkey, finish included |
| Patio fountain waterproofing | from 2,500 DH | same service, different work |
| Concrete pool waterproofing | 250–450 DH/m² | same service, different work |
| Basin and fountain waterproofing | 200–400 DH/m² | same service, different work |
| Survey and written quote | free | no obligation, locked price |
2026 reference values for Marrakech and its region, installation included. The exact quote — free and firm — is set only after measuring on site.
The Medina context
The Marrakech Medina is our home ground: hundreds of riads with centuries-old flat roofs built from earth, cedarwood and lime, where traditional waterproofing — rammed earth layers and tadelakt — is reaching the end of its life. Every job here must respect ADER rules and the UNESCO listing: no hauling tonnes of rubble through narrow derbs, no altering the roofline of the terraces. We use light materials compatible with pisé: flexible resins, flame-free self-adhesive membranes, parapet upturns rebuilt to standard. Leaks in the Medina are unforgiving: they rot the wooden beams, swell the earthen walls and lift the tadelakt off bedroom walls.
In Medina, as everywhere in Marrakech, waterproofing is the poor relation of recent construction: spa and jacuzzi waterproofing is the safest way to put the roof right before a small leak becomes a major damage.
How we work: four steps
Free survey in Medina
We come and measure on site, free of charge and without obligation: membrane condition, falls, drains, upturns and every weak point of your flat roof.
Written quote within 24 hours
You receive an offer itemised line by line: materials, labour, timelines. The price is firm and locked in writing.
Tidy, protected site
We protect stairwells, facades and plants; we work zone by zone and leave the site clean every evening.
Testing and written warranty
Water-tightness test before handover. You leave with a written warranty of up to 10 years and after-works follow-up.
Trusted in Medina
“For spa and jacuzzi waterproofing I had three quotes: theirs wasn’t the cheapest but it was the only one itemised line by line. Price respected to the dirham.”
Fatima Z. · Medina“They re-waterproofed without demolishing: no rubble in the stairwell, a tidy site every evening. The neighbours noticed nothing.”
Sophie M. · Medina“Our riad terrace was redone respecting the Medina’s constraints: materials carried in by hand, parapets rebuilt, zellige preserved. True specialist work.”
Meryem J. · MedinaFrequently asked questions: Spa and jacuzzi waterproofing in Medina
Yes — it is the classic build-up of riad basins: two coats of flexible waterproofing mortar, then zellige laid with water-resistant adhesive and epoxy joints. Beautiful on top, watertight underneath.
Yes: heat, steam, standing water. We use systems resistant to steam and thermal cycling, with high upturns on the walls and specific treatment of the floor-to-wall junction.
Allow 7 to 14 days after application ends, depending on the system (full curing is mandatory). We give you the refilling date in writing in the works schedule.
We handle the waterproofing of the shell and the fittings (skimmers, lights, jets). If the leak is in the buried pipework, we locate it and coordinate the repair with your pool contractor.
Quote within 24 hours, locked price
One WhatsApp message is enough: for spa and jacuzzi waterproofing in Medina you receive an itemised offer with no hidden costs. Written warranty on the works, up to 10 years.
+39 351 481 6739